Unlock performance with aerodynamic blade add-ons

Provide a few key inputs and get an engineering perspective on untapped performance.

Name

Solution

Increase AEP. Keep Operations Running

Performance upgrades shouldn’t complicate your operations

Improving turbine performance should not create unnecessary operational complexity.

PowerCurve upgrade projects are designed around the realities of wind farm operations — turbine availability, weather windows, technician access, safety requirements and coordination with existing maintenance activities.

From initial planning to completed installation, we work to make aerodynamic upgrades straightforward to implement across your site.

PowerCurve provides defined installation procedures, positioning specifications and technical guidance to support accurate and repeatable installation across turbines.
Where appropriate, installation can be coordinated with local installation partners familiar with the site, turbine platform and operating environment.

Our installation approach is designed to reduce the operational impact of aerodynamic upgrades and return turbines to production efficiently.

XX technicians
Typical installation team*

Durability and installation

PowerCurve technologies are installed directly on the blade using a high-strength wet-adhesive bonding system designed for long-term operational durability. Installations can be performed uptower by certified rope technicians or using lift platforms, depending on site requirements and turbine accessibility.

We support installation teams with online training and comprehensive installation guides to ensure consistent installation quality and procedures. The technologies are engineered for the full turbine lifetime and, based on 14 years of operational experience, we have had no reported failures or detachments.

Scroll to Top